Facebook Pixel
May 2008 (82)
June 2008 (16)
July 2008 (16)
September 2008 (7)
October 2008 (11)
November 2008 (8)
December 2008 (5)
January 2009 (10)
February 2009 (8)
March 2009 (9)
April 2009 (10)
May 2009 (10)
June 2009 (14)
July 2009 (4)
September 2009 (8)
October 2009 (16)
November 2009 (11)
December 2009 (6)
January 2010 (10)
February 2010 (5)
March 2010 (8)
April 2010 (12)
May 2010 (10)
June 2010 (38)
July 2010 (6)
September 2010 (40)
October 2010 (28)
November 2010 (7)
December 2010 (7)
January 2011 (9)
February 2011 (17)
March 2011 (39)
April 2011 (9)
May 2011 (3)
June 2011 (9)
July 2011 (7)
August 2011 (5)
September 2011 (6)
October 2011 (8)
November 2011 (10)
December 2011 (7)
January 2012 (19)
February 2012 (5)
March 2012 (6)
April 2012 (9)
May 2012 (22)
June 2012 (10)
July 2012 (15)
August 2012 (13)
September 2012 (22)
October 2012 (10)
November 2012 (8)
December 2012 (3)
January 2013 (8)
February 2013 (8)
March 2013 (8)
April 2013 (29)
May 2013 (13)
June 2013 (8)
July 2013 (7)
August 2013 (3)
September 2013 (5)
October 2013 (9)
November 2013 (7)
December 2013 (25)
January 2014 (17)
February 2014 (7)
March 2014 (8)
April 2014 (23)
May 2014 (22)
June 2014 (15)
July 2014 (17)
August 2014 (7)
September 2014 (21)
October 2014 (21)
November 2014 (14)
December 2014 (13)
January 2015 (15)
February 2015 (15)
March 2015 (16)
April 2015 (11)
May 2015 (18)
June 2015 (13)
July 2015 (6)
August 2015 (6)
September 2015 (5)
October 2015 (11)
November 2015 (11)
December 2015 (8)
January 2016 (9)
February 2016 (9)
March 2016 (4)
April 2016 (7)
May 2016 (5)
June 2016 (3)
July 2016 (4)
August 2016 (4)
September 2016 (3)
October 2016 (4)
November 2016 (5)
December 2016 (4)
January 2017 (5)
February 2017 (4)
March 2017 (8)
April 2017 (5)
May 2017 (5)
June 2017 (6)
July 2017 (5)
August 2017 (4)
September 2017 (4)
October 2017 (5)
November 2017 (4)
December 2017 (3)
January 2018 (4)
February 2018 (3)
March 2018 (4)
April 2018 (4)
May 2018 (5)
June 2018 (4)
July 2018 (4)
August 2018 (5)
September 2018 (4)
October 2018 (4)
November 2018 (4)
December 2018 (3)
January 2019 (4)
February 2019 (2)
March 2019 (2)
April 2019 (2)
May 2019 (2)
June 2019 (3)
July 2019 (4)
August 2019 (4)
September 2019 (1)
October 2019 (4)
November 2019 (1)
January 2020 (1)
April 2020 (2)
May 2020 (1)
September 2020 (1)
October 2020 (1)
December 2020 (1)
May 2021 (1)
January 2022 (1)
May 2022 (1)
November 2022 (1)
January 2023 (1)
June 2023 (1)
November 2023 (1)
February 2024 (1)
Patricia García - May 29, 2015. 11:44
imagen blog

1. Acceso al aparcamiento 2. Jardines 3. Caminos de peatones

Son puntos habitables, estructuras compactas con acceso interior y balcones en voladizo. La situación de los edificios obedece a una composición basada en la vista del lago Constanza. Frente a cada vivienda hay elementos deslizantes de vidrio, algunos de los cuales son transparentes y otros no. Facilitan la regulación de la privacidad.

Complejo Aschlengut BAUMSCHLAGER & EBERLE St. Gallen (Suiza) 2002

Ámbito de parcela: 21,702 m2 Superficia co.
(más...)

Patricia García - May 27, 2015. 11:54
imagen blog

1. Acceso al aparcamiento subterráneo 2. Jardines comunitarios 3. Parque 4. Bloque de apartamentos 5. Equipamiento comunitario

Las torres aprovechan la máxima ocupación en planta. Llegan a la altura permitida y el exceso de edificabilidad que resultaría si todas las plantas fueran iguales, se ajusta mediante excavaciones que van aumentando a medida que crecen en altura, y que se producen en las caras norte y en los puntos más próximos entre las torres.

Illa de la llum LLUIS CLOTET / IGNACIO PARICIO Barcelona (Spain) 2005

Plot area: 7,914 m2 Floor Area: 47,166 m2 .
(más...)

Patricia García - May 25, 2015. 12:28
imagen blog

1. Jardín de infancia 2. Comercio 3. Patio de juegos 4. Parque público 5. Mountain dwellings

Dentro de dos contenedores transparentes cuya formalización obedece a los ejes visuales, los autores del proyecto rinden un homenaje a la Unité d'Habitation mediante corredores que dan acceso a tipologías de vivienda, que se desarrollan en diferentes niveles. Destaca el esfuerzo por individualizar cada apartamento.

Vm housing BIG, JDS (PLOT) Copenhagen (Denmark) 2005

Plot area: 8,027 m2 Floor Area: 25,000 m2 Coverage: 0.44 Floor Area Ratio: 3.11 Dwel.
(más...)

Patricia García - May 25, 2015. 09:26
imagen blog

Este proyecto sorprende por la economía de medios que emplea para adaptarse a una construcción anteriormente dedicada a espacio de oficina y taller. Se interviene sólo en la mitad de unas cubiertas originales de fibrocemento, que posteriormente fueron divididas en dos propiedades independientes con una partición que no se manifiesta al exterior.

 

PROYECTO PUBLICADO EN:

(más...)

Patricia García - May 23, 2015. 12:49
imagen blog

1. Patio con galerías 2. Entrada al patio 3. Cubierta comunitaria 4. Gradas hasta el agua

Los dos edificios se han proyectado para que pongan en relación estas dos partes. Sus dimensiones y posición les permite mediar entre los antiguos edificios y los nuevos. Juntos forman una composición de partes que mantienen un cierto equilibrio inestable.

Java Apartments DIENER & DIENER Ámsterdam (Países Bajos) 2001

Plot area: 6,704 m2 Floor Area: 34,400 m2 Coverage: 0.52 Floor Area Ratio: 5.13 Dwellings: 172 Parking places: 000 .
(más...)

Patricia García - May 22, 2015. 09:36
imagen blog

La necesidad de procurar una buena acústica en salas abiertas, así como el deseo de ofrecer una imagen rotunda de la oficina, llevó a los autores a utilizar el fieltro como material dominante. La posibilidad de recubrir techos y particiones con dicho material la extendieron también al mobiliario y las luminarias, de manera que el interior se convierte en un espacio dotado de carácter, al que la textura del fieltro y sus propiedades fonoabsorbentes le confier.
(más...)

Patricia García - May 21, 2015. 13:08
imagen blog

1. Acceso a ascensores y escalera 2. Acceso al aparcamiento subterráneo 3. Galerías 4. Manzanas de casas en hilera

La Ballena es uno de los tres meteoritos que marcan el área. Siguiendo la huella de la manzana Berlage (50 x 100 m) construida en Ámsterdam Sur, debe albergar un programa dos veces mayor, con una cantidad óptima de soleamiento y las mejores vistas posibles. El perfil de la cubierta corresponde a la posición del sol.

The Whale DE ARCHITEKTEN CIE, FRITS VAN DONGEN Amsterdam (The Netherlands) 2000

Plot area: 7,986 m2 Floor Area: 30,800 m2 Coverage:.
(más...)

Patricia García - May 18, 2015. 09:14
imagen blog

Este proyecto transforma un edificio de oficinas del centro de Burdeos, construido en 1870, en una galería de arte y dos viviendas en planta primera que comparten el acceso desde la calle. El edificio original era una fachada al Cours du Médoc, seguido de dos crujías con muros de piedra, una crujía doble de transición y un almacén con cuatro crujías dobles con cerchas de madera y tirantes metálicos. La superficie total en planta son 450 .
(más...)

Patricia García - May 17, 2015. 11:04
imagen blog

1. Acceso al aparcamiento subterráneo 2. Patios en altura 3. Patio 4. Zócalo en pendiente

Este proyecto es una solución alternativa a la manzana cerrada. Se plantea como un sistema edificatorio más que como un edificio singular. El conjunto, en forma de celosía, intercala 30 volúmenes construidos y 30 vacíos. Dichos vacíos son patios en altura, con espacios comunes, abiertos a perspectivas cruzadas.

Celosía MVRDV, BLANCA LLEÓ Madrid (Spain) 2009

Plot area: 6,021 m2 Floor Area: 13,800 m2 Coverage: 0.35 Flo.
(más...)

Patricia García - May 14, 2015. 12:01
imagen blog

1. Acceso al aparcamiento público 2. Jardín comunitario y área de juegos 3. Edificio de servicios para la comunidad 4. Townhouses 5. Áticos duplex

Las viviendas están ordenadas alrededor de un patio abierto, una plaza, que permite espacios comunes, que se optimizan con un gran jardín paisajístico con área de juegos, limitado en tres de sus lados por las viviendas y en el cuarto, por el edificio de servicios para la comunidad. Los accesos se realizan desde la calle.

Iroko housing HAWORTH TOMPKINS London (United Kingdom) 2002

Plot area: 7,672 m2 Floor Area: 6,390 m2 Coverage: 0.31 Floor Are.
(más...)

Patricia García - May 14, 2015. 09:04
imagen blog

La intervención se desarrolla en el interior de un edificio de oficinas de los años 20. Con una altura entre forjados de 4,50 m y unos ventanales en fachada de 3 m de alto, la monumentalidad del espacio permite configurar una planta con una doble lectura: un zócalo compartimentado hasta 1,20 m mediante bandas paralelas de puestos de trabajo y un vacío a partir de esa altura. La elección de la madera de nogal para el mobiliario y sistemas de almacenamiento fa.
(más...)

Patricia García - May 11, 2015. 12:14
imagen blog

1. Plazas 2. Aparcamiento subterráneo 3. Acceso al aparcamiento

Los dos bloques de cinco alturas forman dos espacios públicos abiertos, que funcionan a modo de plazas de pequeña escala y fácil mantenimiento a las que se vuelcan las viviendas. Sobre un tercer bloque de tres alturas emerge la torre de doce plantas. Los pasos rodados se sitúan en los límites de parcela.

Pradolongo development PAREDES PEDROSA Madrid (Spain) 2006

Plot area: 10,413 m2 Floor Area: 15,603 m2 Coverage: 0.24 Floor Area Ratio:1.
(más...)

Patricia García - May 6, 2015. 09:37
imagen blog

En el centro de ‘s-Hertogenbosch llevaba quince años vacío un viejo garaje de automóviles. Una pareja de diseñadores compraron el edificio e instalaron en él su vivienda y su lugar de trabajo. Al restaurar la fachada se comprobó que el letrero original, que se ha recuperado, estaba oculto detrás de unos paneles. Si se abren las puertas correderas de la entrada las visuales llegan hasta el jardín trasero.

 

PROY.
(más...)

Patricia García - May 5, 2015. 09:00
imagen blog

El libro Why Density? incluye un catálogo de 36 formas urbanas específicas de vivienda colectiva. Éstas han sido seleccionadas teniendo en cuenta la densificación que aportan al entorno y otros factores que aumentan la calidad de la densidad, denominados comportamientos.

 

(más...)

Archivado en: Vivienda Colectiva Densidad Why Density?
Compartir: Facebook TwitThis Google Plus Pinterest Digg StumbleUpon reddit meneame del.icio.us E-mail this story to a friend!
Patricia García - May 4, 2015. 10:01
imagen blog

La necesidad de aunar esfuerzos origina este espacio de coworking en un local existente, en el que varios arquitectos y diseñadores comparten las zonas de trabajo, de reunión y de taller. Con una intervención mínima sobre lo encontrado, los autores colocan un cubo de vidrio en el centro de la sala, en el que se sitúa el taller de maquetas, mientras que el resto del espacio principal queda abierto. La conexión visual entre todas las zonas es permanen.
(más...)

lateral
Share in Twitter Share in Facebook Share in Google Plus Share in Pinterest Suscribe to RSS



cerrar  
condiciones

Si deseas formar parte de a+t ediciones, envíanos tu currículum a la siguiente dirección: aplust@aplust.net






cerrar  
condiciones cerrar

Suscríbete a nuestro newsletter

Introduzca su email:
checkbox He leído y acepto las condiciones de uso
Si quiere darse de baja pinche aquí

ENVIAR

condiciones

a+t, garantiza la seguridad y confidencialidad de los datos personales introducidos a través de este formulario y todo ello al amparo d elo dispuesto en la Ley Orgánica 15/1999 de Protección de Datos Personales así como su normativa de desarrollo.
Si no desea recibir futuros mensajes electrónicos de a+t, piche aquí.



cerrar     

A+T

cerrar
Utilizamos cookies propias y de terceros para mejorar tu experiencia de usuario. Si continuas navegando consideramos que aceptas estas cookies + info > x