Transporting earth and rubble is one of the least sustainable moments in any intervention. Re- sing this waste material as a construction element avoids transportation and dumping, while at the same time offering ways to redefine the landscape of the space in a more cost-effective manner. Earthworks of nearby sites might also be used to achieve the same aims.

While the renovation work of the embankment was ongoing a plan was drawn up to minimize the impact on the run-off and the bike path was re-routed so it could remain open.

 

PROJECT PUBLISHED IN:

 

 


RELATED POSTS

Turning the past into design generator. The existing trees
Turning the past into design generator. The existing trees
Reusing. Slab-benches
Reusing. Slab-benches
Projects for the adaptable city (12)
Projects for the adaptable city (12)
Jeavons Landscape Architects. Clifton Hill Railway. Melbourne. Australia
Jeavons Landscape Architects. Clifton Hill Railway. Melbourne. Australia



close  
condiciones

a+t guarantees to fulfill that which is established by the Spanish Personal-Data Protection Act 15/1999 and all other applicable legislation. a+t adopts the technical, organizational, and security measures required to guarantee confidentiality and integrity of the information.
If you want to unsuscribe from a+t newsletter click here.



close     
condiciones cerrar

Subscribe to our newsletter

Enter your Email:
checkbox I've read and agree to terms and conditions
If you want to unsuscribe click here

SUBMIT

condiciones

If you want to become a part of a+t team, please send us your CV here: aplust@aplust.net






close  

A+T

cerrar
We use own and third-party cookies to improve your user experience with us. If you continue to use this site we will asume that you are accepting this + info > x