Managing earthworks. New slope, new amphitheater
Batlle i Roig. La Marina Park. Viladecans. Spain
December 19, 2014

Photo: Jordi Surroca
The new amphitheater is integrated in the topography that results from the earthworks undertaken during the park construction.
The general project is based on interpreting the dry creek as a natural corridor between the agricultural park and the mountain crossing the city, turning it into an urban park, incorporating when possible the open stretches, recovering its original vegetation and converting the covered parts into tree-lined paths.